Forecaster Performance Criterion 2.2a

 

Forecasts are issued on time

Performance Criterion Description:

The forecaster must ensure that scheduled forecast products are issued at the appointed time.    

 

Scenario:        

During an assessment period the forecaster is asked to issue the regularly scheduled forecasts within an area of responsibility.

 

Evidence:

The forecaster applies knowledge and skill to produce and issue regularly scheduled forecasts within an allotted period while at the same time

·        TAFs

·        landing forecasts

·        take-off forecasts

·        SIGMETs

·        low level flight forecasts

·        aerodrome warnings

·        windshear warnings and alerts